These are the published requirements for building an exhibition stand at Las Vegas Convention Center in Las Vegas. Each figure is read from the venue’s own technical document, dated below. Where Las Vegas Convention Center publishes nothing on a point, this page says so rather than repeating a number from elsewhere.
What the venue publishes
- Stand approval deadline
- 90 days truss, 30 days multilevel
- Approval fee
- Not published
- Two-storey lead time
- 30 days before move-in
- Who signs the structure
- Nevada-registered stamp
- Upper-floor live load
- Not published
- Maximum load per rigging point
- Not published
- Who may install rigging
- The appointed general service contractor
Source: LVCC Building Users Manual — Extract, November 2023
Source: LVCC Building Users Manual — Extract, November 2023
Source: LVCC Building Users Manual — Extract, November 2023
Approval needed above 200 lbs
Source: Las Vegas Convention Center Rigging Regulations — FY23
Read in full
What each venue actually requires, read from its own documents.
Ten major exhibition venues, and the four things that decide whether a build starts on time: the approval deadline, the two-storey rules, the rigging limit and who is allowed to install it. Every figure is read from that venue’s own technical document, and where a venue publishes nothing, this says so instead of filling the gap.